Mass Rapid Transit ( MRT ) Coordinated Installation Programme (CIP)

Sample Schedule B4 _Degree Finish Dates

For Singapore Land Transport Authority (LTA) Mass Rapid Transit (MRT) projects, a schedule B4 -Degree Finish Dates with 1st Fix, 2nd Fix and 3rd Fix/Final Fix milestones for each of the Category A, B, C and D rooms and Key Finish milestones dates including Trackworks installation, 3rd Rail DC Power, Internal Overpressure Test, GenSet Test, Overpressure and Airflow Regime Test and Civil Defence Integrated Systems Test will be issued. Above is a sample.

General Architectural Finishes Sequence
General Architectural Sequence – Aluminum
Typical Platform Screen Door Sequence of Works
Access Management System -Sequence of Works

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s